SAMCHEOK Coal-Fired power plant

Samcheok Coal-fired Power Plant project was to build and operate an ultra-supercritical power plant in Samcheok-si, Gangwon-do with an investment of approximately KRW 5 trillion. POSCO E&C and Doosan Heavy Industries & Construction jointly invested shares and formed an EPC consortium for this project. 

Ultra supercritical power plant is a large-scale and high-efficiency coal-fired plant. It is the most evolved coal-fired power generation technology. Based on this performance, POSCO E&C secured a track record in the field of coal-fired power generation (subcritical–supercritical–ultra-supercritical). 

We also secured a foundation for participation in coal-fired power generation projects with more advanced technologies.

  • Period
    Period
    2019.08 - 2024.04
  • Place of order
    Place of order
    POSPOWER
  • Construction details
    Construction details
    Power generation capacity: 1,055 MW × 2 (ultra supercritical coal-fired power)
  • Location
    Location
    Sam-Cheok Si, Korea