Eunsung/Kwangjin PV Power Plant project was aimed for solar power generation by 45 MW through a plant located in Mungyeong-si, Gyeongsangbuk-do. POSCO E&C was selected from the top-tier EPC service providers for the EPC contract for this project.
Eunsung/Kwangjin PV Power Plant project was aimed for solar power generation by 45 MW through a plant located in Mungyeong-si, Gyeongsangbuk-do. POSCO E&C was selected from the top-tier EPC service providers for the EPC contract for this project.
CHAPTER I GENERAL PROVISIONS
Article 1 (Purpose)
The purpose of this Policy is to fulfill appropriate duties and comply with applicable laws by setting matters POSCO E&C Ltd. (the “Company”) must comply with in relation to the installation and operation of closed-circuit televisions and protection of footages.
Article 2 (Definitions)
The terms used in this Policy shall be defined as follows:
Article 3 (Scope of Application)
Article 4 (Protection of Footages)
CHAPTER II REQUIREMENTS FOR CCTV INSTALLATION
Article 5 (Notification of Installation Plans, etc.)
In the event of installing a CCTV, the Company shall prepare a CCTV installation and operation plan (“Plan”) that includes the following items:
Article 6 (Designation of CCTV Managers)
Article 7 (Installation of Caution Signs)
CHAPTER III REQUIREMENTS FOR HANDLING FOOTAGES
Article 8 (Limitation on Collection)
Article 9 (Limitation on Processing)
Footages of a data subject may not be used for other purposes than the CCTV installation purpose or be granted access or provided to a person who has no access authority: Provided, That this shall not apply in any of the following circumstances:
Article 10 (Safeguards, etc.)
Article 11 (Request for Access, etc.)
Article 12 (Retention and Deletion)
Footages collected through CCTVs shall be deleted without delay once the data retention period mentioned in the Plan expires: Provided, That when it is difficult to determine the minimum period of time required to achieve the purpose of data retention due to the nature of a division, the retention period shall be within thirty (30) days after the collection of footages.
CHAPTER IV SUPPLEMENTARY PROVISIONS
Article 13 (Consignment of Duties)
Article 14 (Confidentiality)
Those who handle or have handled footages shall not use the obtained data for inappropriate purposes, such as revealing, processing without authority, and/or providing for the use of another person.
Article 15 (Exclusion)
This Policy shall not be applied to CCTVs installed and operated to supervise the duties of individuals who are with the military regardless of their duties.