Busan Songjeong Logistics Distrubution Center

The Logistics Distribution Center in Songjeong-dong, Busan with the gross floor area of approximately 24,000㎡ consists of one basement level and six ground floors. 

This is the first logistics facility in Busan New Port that is equipped with an automated cold storage. 

Located in the Economic Free Zone of Busan New Port, this logistics center is also connected to Busan New Port and Gimhae International Airport. Considering its seaside location, the logistics center was designed to withstand strong wind. With facilities including a receiving and shipping point, a quick freezing room, an automated cold storage, and a manual storage (two floors), Songjeong Logistics Distribution Center produces storage efficiency more than nine times higher than that of an ordinary warehouse. 

The automated storage enables real-time inventory management and receipt and release management, which leads to a decrease in the logistics center operating cost. In addition, the highly efficient and durable facilities contribute to saving energy, and the centralized automatic control freezing system ensures stable freezing quality. 

To flexibly respond to the shippers’ varying needs as well as handling of unstandardized products and emergency receipt and shipping, the logistics center has a separate manually operated cold storage.

  • Period
    Period
    2013.12 - 2015.10
  • Place of order
    Place of order
    Iass holdings Co., Ltd.
  • Construction details
    Construction details
    Gross floor area: 24,361 ㎡
  • Location
    Location
    Busan, Korea

Personal Data Processing Policy Legal Disclaimer

CCTV Operation policy