Strong Foundation Puts Us Ahead of the Curve

Foundation

When problems occur during construction, we develop innovative solutions by performing thorough analyses to identify the root causes. This approach has built our engineering expertise in deep-underground tunnel construction, temporary retaining wall solutions, slope and pile installation and soft ground improvement works. Our objective goes beyond cost and time reduction; we place strong emphasis on worksite safety.

대체 텍스트
  • 01Anchor for Reinforcing Slope and Cut-Slope Retaining Walls on Rock (EJP Anchor)
  • 02Anchor for Reinforcing temporary retaining Walls on Soft Foundation
  • 03Composite Pile Consisting of Steel Pipe and PHC Pile (PCFT Composite Pile)
  • 04Shallow Foundation for Low to Medium-Level Structures (PF Technique)
  • 05Rock Bolt for Reinforcing Ground Using High-Strength Steel Pipe (SP Rock Bolt)
  • 06FNS functional underground structure (Piles/ Land and marine solidification admixtures)
  • 01. Anchor for Reinforcing Slope and Cut-Slope Retaining Walls on Rock (EJP Anchor)

    01. Anchor for Reinforcing Slope and Cut-Slope Retaining Walls on Rock (EJP Anchor)
  • 02. Anchor for Reinforcing temporary retaining Walls on Soft Foundation

    02. Anchor for Reinforcing temporary retaining Walls on Soft Foundation
  • 03. Composite Pile Consisting of Steel Pipe and PHC Pile (PCFT Composite Pile)

    03. Composite Pile Consisting of Steel Pipe and PHC Pile (PCFT Composite Pile)
  • 04. Shallow Foundation for Low to Medium-Level Structures (PF Technique)

    04. Shallow Foundation for Low to Medium-Level Structures (PF Technique)
  • 05. Rock Bolt for Reinforcing Ground Using High-Strength Steel Pipe (SP Rock Bolt)

    05. Rock Bolt for Reinforcing Ground Using High-Strength Steel Pipe (SP Rock Bolt)
  • 06. FNS functional underground structure (Piles/ Land and marine solidification admixtures)

    06. FNS functional underground structure (Piles/ Land and marine solidification admixtures)

Personal Data Processing Policy Legal Disclaimer

CCTV Operation policy