KPA (IV) PROJECT

The KPA (IV) Project located in Yeosu aimed at expanding Kumho P&B Chemicals’ plant in Yeosu National Industrial Complex. The end goal was to increase phenol production volume in response to the increased phenol demand in Korea and abroad. Through the plant extension, Kumho P&B Chemicals is able to produce 900,000 tons of cumene, 700,000 tons of phenol, and 435,000 tons of acetone annually. POSCO E&C completed the plant in 2016 on an EPC turn-key basis covering the design, procurement, and installation works.

  • Period
    Period
    2013.02 - 2016.03
  • Place of order
    Place of order
    Kumho P&B Chemicals
  • Construction details
    Construction details
    Demolition of existing cumene plant (KPA I) followed by extension (420,000 tons/year → 900,000 tons/year), phenol production facility extension to 300,000 tons/year
  • Location
    Location
    Yeosu-si, Jeollanam-do