Pohang No.3 FINEX PJT

Pohang No. 3 FINEX project was to install a third-generation FINEX with an annual production capacity of 2 million tons to lead the global new steel technology market. Through innovative technological evolution and scale-up, the commercial FINEX facility with an annual production capacity of 1.5 million tons was completed in 2007. 

POSCO E&C demonstrated its project implementation capacity by successfully installing the two-million-ton FINEX facility for the first in the world. In particular, it was a project that fulfilled the entire goals for safety, environment, construction period, and quality.

  • Period
    Period
    2011.06 - 2014.01
  • Place of order
    Place of order
    POSCO
  • Construction details
    Construction details
    Production capacity: 2 million tons a year

    Key facility specifications
    - Melting furnace: 240 tHM/h, hearth diameter of 11.5 m
    - Fluidized reduction furnace: 3 reactors, distribution plate diameter of 9.8 m
    - HCI: 55 t/h × 8 lines
    - Coal briquette: 55 t/h × 3 lines
    - PCI: 50 t/h × 1 set
  • Location
    Location
    Pohang, Republic of Korea